September 27, 2024

Well 7 Site Selection, 2025 GIS Contract Update, Well 4 HMO Treatment Sewer Discharge Design and Approval status, installing a right arrow sign at intersection of Burroughs Dr and Evergreen Ln, 2025 Street Projects Status update, maintenance of driveway approaches, lead service line study update, and tuckpoint bid for WWII Monument.

August 28, 2024

2024 Pavement Crackfilling, 2024 Road & Utility Improvements, Lake Week Removal Continuance, Possible Action on Well 7 Site Selection, Possible Action on 1307 Chesterwood Sidewalk, 219 Park Ave Storm Sewer Collapse, Driveway Approaches, Parking Signage on Lake St. and Orchard Ave, and 2025 Street Projects.

February 2, 2024

Sign evaluation on Prospect Ave, Fluoride in water supply, speed humps for Lake St, School St, and Prospect Ave, and Stormwater Pond Maintenance at Riverside Preserve

September 29, 2023

Prospect Ave/School District Area Sign Evaluation, No Parking on Tower Ct.

March 17, 2023

West Wisconsin Parking Request, Above Grade Communication Cabinet, Seasonal Staffing, Lakefront Speed Limit, Lakefront Public Assets, PW&S Quarterly Meetings

March 3, 2023

West Wisconsin Parking Request, Seasonal Staffing, Lakefront Speed Limit, Lakefront Public Assets, PW&S Quarterly Meetings

July 15, 2022

10-Year Infrastructure Capital Improvement Program, Amendment to Code 86.119.5(c) Regarding Parking and Parking on Dynex Drive

June 1, 2022

Ordinance Regarding No Parking on the South Side of Oakton, Water System Master Plan, 2022 Sanitary Survey Report, Stripping of Crosswalks on Main St, Exploration of Adding Raised Pedestrian Crossings, Grass Cutting along Capitol Drive under Hwy 16, Safe Streets and Roads for All Grant Program

December 3, 2021

Ordinance 2021-09 Amending No Parking on South Side of Oakton, White Oaks Lift Station, Sanitary Sewer and Manhole Repairs, Exempt Water Meters, School District Area Sign Evaluations, 2021 Bi-Annual State Required Pavement Ratings.

July 26, 2021

Utility Bill Reduction at 1355 Capitol Dr, Parking on Oakton Ave, White Oaks Lift Station, Sidewalks on West Side of STH 164, Sidewalk Maintenance Code 78.109

May 28, 2021

1355 Capitol Drive Utility Bill Reductions; 2022-2023 Design Engineering Services RFP Projects from Strategic Plan Capital Projects and Equipment List Plan; Creating No Parking Zone 200 Oakton Ave.; Road Surface at Oakton Ave./Park Ave. and Main St.; Mowing at HWY 16 Overpass at Capitol Drive; Installation of Solar Powered "Flashing Wrong-Way" Signs at Lake St. and Lookout Drive

April 2, 2021

1355 Capitol Drive Utility Reduction, Lake Street Parking, Snow and Ice Removal, Kueny Arch. Space Needs Assessment, Healthy Lakes Project

February 26, 2021

Utility Bill Reduction 1355 Capitol Drive, Northwest Sanitary Sewer Study, Snow and Ice Removal Ordinance, Space Needs Assessment and Master Plan.

November 25, 2020

Stop Signs on Oakton Ave, Utility Bill Reduction for 1355 Capitol Drive and 716 Stepping Stone Way and Pavement Rating Update

July 31, 2020

All Terrain Vehicles and Utility Terrain Vehicles on Village Streets, Sanitary Sewer Study with the City of Pewaukee, Stop Signs on Oakton Ave, Annual Curb Painting, EPA Mandate on AWIA Risk and Resilience Assessments and Emergency Response Plan

July 2, 2020

Ordinance for Golf Cart and Low Speed Vehicles, Corrosion Control Treatment Submittals to DNR Bureau

May 29, 2020

2020 Crack Sealing Proposal, Low Speed Vehicles, Parking Restrictions on First Street, Reserve Parking for 203 West Wisconsin Ave and Trailer Parking on Lake Street

February 28, 2020

Cameras on Light Poles, Recycling/Yard Waste Center, Re-evaluation of Maximum Assessment of Curb and Gutter and Annual Unidirectional Flushing

January 31, 2020

Strategic Plan Implementation, Remote Lake Level Installation, Winter Snow Removal, Plowing Ole Dairy Road, Dumpsters on Village Streets,

January 3, 2020

Lake Weed Collection Policy, Sanitary Sewer Lining Proposal for 221 West Wisconsin, Sidewalk Installation for West Ave, Kopmeier Lift Station Reconstruction, Bi-Annual Village-Wide Pavement Evaluations